Login
Gallery Little Devil 2005 Rear Shock Hoop and continued repairs - July/Aug
Advanced Search
View Slideshow View Slideshow (Fullscreen)

2005

1. Cage... ... 3. Paint Schemes 4. Painting... 5. Final... 6. Repairing... 7. Rear Shock ... 8. 8/6 -... 9. Acton...

Rear Shock Hoop and continued repairs - July/Aug

Date: 07/29/2005
Size: 39 items
nextlast
Checking droop

Checking droop

Checking droop

Date: 12/31/1969
Views: 1483
Roughly where I thought the shocks would come up

Roughly where I thought the shocks would come up

Roughly where I thought the shocks would come up

Date: 12/31/1969
Views: 1039
Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Date: 12/31/1969
Views: 1175
dcp 0014

dcp 0014

dcp 0014

Date: 12/31/1969
Views: 987
Holding the new U-bolt plate based lower mount in place for testing

Holding the new U-bolt plate based lower mount in place for testing

Holding the new U-bolt plate based lower mount in place for testing

Date: 12/31/1969
Views: 1173
See the lower mount?

See the lower mount?

See the lower mount?

Date: 12/31/1969
Views: 980
To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

Date: 12/31/1969
Views: 1626
To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

Date: 12/31/1969
Views: 1208
First mock up of the uprights

First mock up of the uprights

First mock up of the uprights

Date: 12/31/1969
Views: 1025
Checking "bump" clearance

Checking "bump" clearance

Checking "bump" clearance

Date: 12/31/1969
Views: 1127
For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

Date: 12/31/1969
Views: 1241
The uprights

The uprights

The uprights

Date: 12/31/1969
Views: 1152
dcp 0023

dcp 0023

dcp 0023

Date: 12/31/1969
Views: 4140
dcp 0024

dcp 0024

dcp 0024

Date: 12/31/1969
Views: 1561
dcp 0025

dcp 0025

dcp 0025

Date: 12/31/1969
Views: 1059
Welding

Welding

Welding

Date: 12/31/1969
Views: 1584
dcp 0027

dcp 0027

dcp 0027

Date: 12/31/1969
Views: 970
dcp 0028

dcp 0028

dcp 0028

Date: 12/31/1969
Views: 1154
Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Date: 12/31/1969
Views: 1327
After welding the mounts onto the bolt-in upright hoop.

After welding the mounts onto the bolt-in upright hoop.

After welding the mounts onto the bolt-in upright hoop.

Date: 12/31/1969
Views: 1351
dcp 0002

dcp 0002

dcp 0002

Date: 12/31/1969
Views: 1893
dcp 0003

dcp 0003

dcp 0003

Date: 12/31/1969
Views: 1116
U-bolt plates after welding the lower mounts to them.  They are offset to the outside of the vehicle.

U-bolt plates after welding the lower mounts to them. They are offset to the outside of the vehicle.

U-bolt plates after welding the lower mounts to them. They are offset to the outside of the vehicle.

Date: 12/31/1969
Views: 2907
Paint

Paint

Paint

Date: 12/31/1969
Views: 1218
Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Date: 12/31/1969
Views: 1207
nextlast
Page: 1 2
Advanced Search
Powered by Gallery v2.3