Login
Gallery Little Devil 2005 Rear Shock Hoop and continued repairs - July/Aug
Advanced Search
RSS Feed for this Album View Slideshow View Slideshow (Fullscreen)

2005

1. Cage... ... 3. Paint Schemes 4. Painting... 5. Final... 6. Repairing... 7. Rear Shock ... 8. 8/6 -... 9. Acton...

Rear Shock Hoop and continued repairs - July/Aug

Date: 07/29/2005
Size: 39 items
nextlast
Checking droop

Checking droop

Checking droop

Date: 12/31/1969
Views: 1505
Roughly where I thought the shocks would come up

Roughly where I thought the shocks would come up

Roughly where I thought the shocks would come up

Date: 12/31/1969
Views: 1061
Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Date: 12/31/1969
Views: 1205
dcp 0014

dcp 0014

dcp 0014

Date: 12/31/1969
Views: 1008
Holding the new U-bolt plate based lower mount in place for testing

Holding the new U-bolt plate based lower mount in place for testing

Holding the new U-bolt plate based lower mount in place for testing

Date: 12/31/1969
Views: 1195
See the lower mount?

See the lower mount?

See the lower mount?

Date: 12/31/1969
Views: 995
To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

Date: 12/31/1969
Views: 1646
To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

Date: 12/31/1969
Views: 1238
First mock up of the uprights

First mock up of the uprights

First mock up of the uprights

Date: 12/31/1969
Views: 1048
Checking "bump" clearance

Checking "bump" clearance

Checking "bump" clearance

Date: 12/31/1969
Views: 1151
For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

Date: 12/31/1969
Views: 1270
The uprights

The uprights

The uprights

Date: 12/31/1969
Views: 1176
dcp 0023

dcp 0023

dcp 0023

Date: 12/31/1969
Views: 4165
dcp 0024

dcp 0024

dcp 0024

Date: 12/31/1969
Views: 1587
dcp 0025

dcp 0025

dcp 0025

Date: 12/31/1969
Views: 1080
Welding

Welding

Welding

Date: 12/31/1969
Views: 1610
dcp 0027

dcp 0027

dcp 0027

Date: 12/31/1969
Views: 998
dcp 0028

dcp 0028

dcp 0028

Date: 12/31/1969
Views: 1175
Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Date: 12/31/1969
Views: 1350
After welding the mounts onto the bolt-in upright hoop.

After welding the mounts onto the bolt-in upright hoop.

After welding the mounts onto the bolt-in upright hoop.

Date: 12/31/1969
Views: 1372
dcp 0002

dcp 0002

dcp 0002

Date: 12/31/1969
Views: 1917
dcp 0003

dcp 0003

dcp 0003

Date: 12/31/1969
Views: 1139
U-bolt plates after welding the lower mounts to them.  They are offset to the outside of the vehicle.

U-bolt plates after welding the lower mounts to them. They are offset to the outside of the vehicle.

U-bolt plates after welding the lower mounts to them. They are offset to the outside of the vehicle.

Date: 12/31/1969
Views: 2932
Paint

Paint

Paint

Date: 12/31/1969
Views: 1248
Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Date: 12/31/1969
Views: 1238
nextlast
Page: 1 2
Advanced Search
Powered by Gallery v2.3