Primary power box. Two 50amp breakers go in the bottom - one for the welder, one for the sub-panel. One 220/20amp goes in the
Primary power box. Two 50amp breakers go in the bottom - one for the welder, one for the sub-panel. One 220/20amp goes in the top, and I'll have 3 slots left when I'm done. Box above/right will be the on/off switch for the heat, with the thermostat nearby. Heavy gauge wires hanging down are 6-2G and 6-3G for the welder and sub.