Login
Gallery Little Devil 2005 Rear Shock Hoop and continued repairs - July/Aug
Advanced Search
RSS Feed for this Album View Slideshow View Slideshow (Fullscreen)

2005

1. Cage... ... 3. Paint Schemes 4. Painting... 5. Final... 6. Repairing... 7. Rear Shock ... 8. 8/6 -... 9. Acton...

Rear Shock Hoop and continued repairs - July/Aug

Date: 07/29/2005
Size: 39 items
nextlast
Checking droop

Checking droop

Checking droop

Date: 12/31/1969
Views: 1532
Roughly where I thought the shocks would come up

Roughly where I thought the shocks would come up

Roughly where I thought the shocks would come up

Date: 12/31/1969
Views: 1070
Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Shorter slot on the passenger side after I decided the shocks could be run straight up, not angled.

Date: 12/31/1969
Views: 1215
dcp 0014

dcp 0014

dcp 0014

Date: 12/31/1969
Views: 1024
Holding the new U-bolt plate based lower mount in place for testing

Holding the new U-bolt plate based lower mount in place for testing

Holding the new U-bolt plate based lower mount in place for testing

Date: 12/31/1969
Views: 1220
See the lower mount?

See the lower mount?

See the lower mount?

Date: 12/31/1969
Views: 1002
To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

Date: 12/31/1969
Views: 1671
To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

To build the uprights for the hoop, I hole-sawed a single piece of tube, then cut it in half on the bandsaw

Date: 12/31/1969
Views: 1248
First mock up of the uprights

First mock up of the uprights

First mock up of the uprights

Date: 12/31/1969
Views: 1069
Checking "bump" clearance

Checking "bump" clearance

Checking "bump" clearance

Date: 12/31/1969
Views: 1164
For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

For the upper mounts, I hole-sawed some flat stock, which I then cut in half lengthwise to make a total of 4 tabs

Date: 12/31/1969
Views: 1291
The uprights

The uprights

The uprights

Date: 12/31/1969
Views: 1194
dcp 0023

dcp 0023

dcp 0023

Date: 12/31/1969
Views: 4192
dcp 0024

dcp 0024

dcp 0024

Date: 12/31/1969
Views: 1612
dcp 0025

dcp 0025

dcp 0025

Date: 12/31/1969
Views: 1110
Welding

Welding

Welding

Date: 12/31/1969
Views: 1625
dcp 0027

dcp 0027

dcp 0027

Date: 12/31/1969
Views: 1019
dcp 0028

dcp 0028

dcp 0028

Date: 12/31/1969
Views: 1200
Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Comparing a 7100 Remote Reservoir to a 5125 for ideas on how to affix the upper tabs

Date: 12/31/1969
Views: 1376
After welding the mounts onto the bolt-in upright hoop.

After welding the mounts onto the bolt-in upright hoop.

After welding the mounts onto the bolt-in upright hoop.

Date: 12/31/1969
Views: 1389
dcp 0002

dcp 0002

dcp 0002

Date: 12/31/1969
Views: 1940
dcp 0003

dcp 0003

dcp 0003

Date: 12/31/1969
Views: 1168
U-bolt plates after welding the lower mounts to them.  They are offset to the outside of the vehicle.

U-bolt plates after welding the lower mounts to them. They are offset to the outside of the vehicle.

U-bolt plates after welding the lower mounts to them. They are offset to the outside of the vehicle.

Date: 12/31/1969
Views: 2961
Paint

Paint

Paint

Date: 12/31/1969
Views: 1274
Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Preparing to tear down one of the 7100s for revalving and a seal replacement on the reservoir

Date: 12/31/1969
Views: 1257
nextlast
Page: 1 2
Advanced Search
Powered by Gallery v2.3