Login
Gallery Our House 2004 March - more sheetrock
Advanced Search
View Slideshow View Slideshow (Fullscreen)

2004

1. January -... 2. March -... 3. April/May -... 4. Landscaping... 5. July 6. Yard - 8/2004 7. Shop 8/2004 ... 10. Yard/Field ...

March - more sheetrock

Date: 03/11/2004
Size: 87 items
nextlast
SW corner, two layers up.  3/11

SW corner, two layers up. 3/11

SW corner, two layers up. 3/11

Date: 12/31/1969
Views: 2806
SE corner, no progress yet - other than a much smaller stack of sheetrock!

SE corner, no progress yet - other than a much smaller stack of sheetrock!

SE corner, no progress yet - other than a much smaller stack of sheetrock!

Date: 12/31/1969
Views: 1349
More wiring done on the North wall.  Not quite finished - the cable TV, phone, and ethernet need to be run before this wall can

More wiring done on the North wall. Not quite finished - the cable TV, phone, and ethernet need to be run before this wall can

More wiring done on the North wall. Not quite finished - the cable TV, phone, and ethernet need to be run before this wall can be buttoned up.

Date: 12/31/1969
Views: 1167
Attic access above the "man-door"

Attic access above the "man-door"

Attic access above the "man-door"

Date: 12/31/1969
Views: 1693
North wall, east side - two layers of drywall, lots of wiring done.

North wall, east side - two layers of drywall, lots of wiring done.

North wall, east side - two layers of drywall, lots of wiring done.

Date: 12/31/1969
Views: 1458
Ben P. did this entire (W) wall one day while I was roughing in more wiring.

Ben P. did this entire (W) wall one day while I was roughing in more wiring.

Ben P. did this entire (W) wall one day while I was roughing in more wiring.

Date: 12/31/1969
Views: 1443
Primary power box.  Two 50amp breakers go in the bottom - one for the welder, one for the sub-panel.  One 220/20amp goes in the

Primary power box. Two 50amp breakers go in the bottom - one for the welder, one for the sub-panel. One 220/20amp goes in the

Primary power box. Two 50amp breakers go in the bottom - one for the welder, one for the sub-panel. One 220/20amp goes in the top, and I'll have 3 slots left when I'm done. Box above/right will be the on/off switch for the heat, with the thermostat nea

Date: 12/31/1969
Views: 4528
Sub box on the east side of the N wall.  It's full.  1 40amp for the oven (outlet below/right), 5 220 20amp breakers for 5 of th

Sub box on the east side of the N wall. It's full. 1 40amp for the oven (outlet below/right), 5 220 20amp breakers for 5 of th

Sub box on the east side of the N wall. It's full. 1 40amp for the oven (outlet below/right), 5 220 20amp breakers for 5 of the 6 220/20 outlets in the shop. Two of the 20amp breakers also sport 15amp 110s in 'em (a "double" breaker). Two 15

Date: 12/31/1969
Views: 2112
3/11 - the trench for the gas, still not filled in.  It snowed and the ground froze on me. :D

3/11 - the trench for the gas, still not filled in. It snowed and the ground froze on me. :D

3/11 - the trench for the gas, still not filled in. It snowed and the ground froze on me. :D

Date: 12/31/1969
Views: 1609
Two motion lights at the back of the shop, where I intend to store extra rigs

Two motion lights at the back of the shop, where I intend to store extra rigs

Two motion lights at the back of the shop, where I intend to store extra rigs

Date: 12/31/1969
Views: 1916
Wide view standing NW of the shop, looking SE.  The vent for the 200k BTU heater is visible, the two motion lights to the West,

Wide view standing NW of the shop, looking SE. The vent for the 200k BTU heater is visible, the two motion lights to the West,

Wide view standing NW of the shop, looking SE. The vent for the 200k BTU heater is visible, the two motion lights to the West, and one light at the top of the North end, which covers the area between the shop and house.

Date: 12/31/1969
Views: 1727
G'morning, Michelle

G'morning, Michelle

G'morning, Michelle

Date: 12/31/1969
Views: 1092
Line-up from the end of the driveway.  Travelette, Oscar, Tigger, Laser, Michelle's Toy pickup.  Two motion lights - one between

Line-up from the end of the driveway. Travelette, Oscar, Tigger, Laser, Michelle's Toy pickup. Two motion lights - one between

Line-up from the end of the driveway. Travelette, Oscar, Tigger, Laser, Michelle's Toy pickup. Two motion lights - one between the doors, one just above/right of the right (north) double door.

Date: 12/31/1969
Views: 1268
..and BUGM out in the field by itself.

..and BUGM out in the field by itself.

..and BUGM out in the field by itself.

Date: 12/31/1969
Views: 1344
Tigger, with one of the motion lights between the doors, might see an outlet lower down, too.

Tigger, with one of the motion lights between the doors, might see an outlet lower down, too.

Tigger, with one of the motion lights between the doors, might see an outlet lower down, too.

Date: 12/31/1969
Views: 1036
After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

Date: 12/31/1969
Views: 1016
After working all weekend, around 11pm, Sunday 3/14.. DONE - well, ready for tape and mud..

After working all weekend, around 11pm, Sunday 3/14.. DONE - well, ready for tape and mud..

After working all weekend, around 11pm, Sunday 3/14.. DONE - well, ready for tape and mud..

Date: 12/31/1969
Views: 1152
After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

Date: 12/31/1969
Views: 1699
After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

Date: 12/31/1969
Views: 1058
After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

Date: 12/31/1969
Views: 1015
After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

Date: 12/31/1969
Views: 1044
After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

Date: 12/31/1969
Views: 1064
After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

Date: 12/31/1969
Views: 1006
After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

After working all weekend, around 11pm, Sunday 3/14.. DONE

Date: 12/31/1969
Views: 955
3/15 - cat trying to eat my antlers

3/15 - cat trying to eat my antlers

3/15 - cat trying to eat my antlers

Date: 12/31/1969
Views: 1375
nextlast
Page: 1 2 3 4
Advanced Search
Powered by Gallery v2.3